Commercial · Institutional · Government
— HAZARDOUS MATERIAL REMOVAL · COMMERCIAL · NYC & TRI-STATE

Hazardous Material Removal in New York City & the Tri-State Area

Identified 🡢 Contained 🡢 Manifested 🡢 Documented.

CRE removes and disposes of regulated materials in commercial, industrial and institutional properties across New York City, Long Island, Westchester and the Tri-State area: PCB-containing materials, mercury equipment, petroleum and chemical residues, abandoned drums and laboratory or industrial waste. We characterize, contain, package and manifest — and deliver the paperwork that proves where it went. When the space has to be rebuilt afterward, CRE does that too.

Immediate danger, fumes or a release in progress? Call 911 first, then call us — 24/7.

Hazardous material removal — at a glance

1

Characterize first

Sampling and laboratory results decide the classification.

2

Trained crews

Contain and package under a written health and safety plan.

3

Permitted hauler

A permitted hauler moves it under manifest to a permitted facility.

4

You receive the records

Profiles, manifests and certificates of disposal.

— Definition

What Counts as Hazardous Material Removal?

Hazardous material removal is the safe identification, containment, packaging and lawful disposal of regulated substances found in or on a property — such as PCBs, mercury, petroleum and chemical residues, abandoned drums, and laboratory or industrial chemicals. The job ends with a paper trail: manifests and disposal records that show where the material went.

The two decisions that matter are what the material is and who is allowed to move it. Characterization (sampling or documentation) determines how it is classified; classification determines packaging, transport and which facility can take it. We handle both, and we hand you the records.

— Is this your situation?

When Do You Need Hazardous Material Removal?

Found during demolition or renovation

Old fluorescent ballasts, caulks, mastics, transformers, tanks and drums surface when walls and ceilings open up. Stop, identify and plan before disturbing them.

Abandoned or unknown containers

A previous tenant leaves drums, cans or unlabeled containers. Do not move or mix them. We characterize and remove them under manifest.

Laboratory or industrial decommissioning

Labs, shops, print facilities and light-industrial spaces need chemicals, equipment and residues cleared before lease end, sale or conversion.

Spill or release

Fuel, oil, solvent and chemical releases need containment, cleanup and, where required, regulatory notification. Report as the rules require, then bring in qualified responders.

Due-diligence findings

An environmental report that identifies regulated materials turns into a removal scope and budget before closing. We price against the report.

— What we rebuild

Hazardous Materials We Remove

CategoryTypical sourcesRegulation and handling
PCBsFluorescent light ballasts and capacitors made before about 1980; some caulks, paints and mastics from the 1950s–70sFederal TSCA rules (40 CFR 761) regulate PCB wastes at or above 50 ppm. Sampling determines classification and disposal route
MercuryFluorescent and HID lamps, thermostats, switches, gauges and manometersUniversal or hazardous waste. Intact removal and recycling where allowed; controlled cleanup of spills
Petroleum and fuelHeating-oil tanks, drums, oil/water separators, spill residueState spill reporting and cleanup rules apply. Reporting windows are short 
Chemicals and lab wasteLaboratories, shops, print facilities, chemical storage roomsCharacterized by hazard (ignitable, corrosive, reactive, toxic) before packaging and transport
Contaminated soil and residuesTank removals, excavations, industrial sitesSampling and facility acceptance decide disposal
Other regulated itemsBatteries, refrigerants, aerosols, suppression agentsUniversal waste or specialty recycling
— Our process

Our Hazardous Material Removal Process

Hazmat jobs fail on classification and paperwork more often than on field work. The sequence below is built to get both right.
01

Site assessment

We inspect the site, inventory the materials, review labels and documents and decide what can be handled immediately and what needs sampling. Unknown containers are not moved or mixed.

02

Characterization

Sampling and laboratory analysis, or documentation for known products, classify each waste stream. That classification fixes packaging, transport and the facility.

03

Work plan and safety plan

We write the scope, the health and safety plan and the waste management plan. Crews work under OSHA HAZWOPER requirements with the PPE the hazard calls for.

04

Containment and removal

Materials are removed intact where possible, with secondary containment, spill controls and decontamination. Spills and releases are controlled and cleaned before they spread.

05

Packaging and manifesting

Waste is packaged, labeled and documented to transport rules. We prepare the manifest or shipping papers for the generator's signature.

06

Transport, disposal and records

A permitted hauler takes the waste to a permitted facility. We collect the returned documents and deliver a closeout package you can hand to your lender, insurer or agency.

— Regulatory landscape

Who Regulates Hazardous Materials, and What You Receive

AgencyWhere it appliesWhy it matters
EPAHazardous waste (RCRA) and PCBs (TSCA)Sets classification, storage, transport and disposal rules
NYS DECHazardous waste, waste transporter permits and petroleum spills in New YorkHaulers must be permitted; spills have reporting duties 
OSHAWorker protection during hazardous-waste operations (HAZWOPER)Training, medical monitoring and PPE for crews
US DOTPackaging, labeling and shipping of hazardous materialsContainers, markings and manifests must meet transport rules

Under these rules the property owner or tenant is normally the waste generator, which means the manifest is signed on the generator’s behalf and the generator keeps responsibility for the waste. We prepare the paperwork for your signature, choose permitted facilities and keep the records straight.

Your closeout package

What Happens Next

STEP-1

Waste manifested and records issued

STEP-2

Surfaces and systems restored

STEP-3

Finishes replaced and space released

— the rebuild

After Hazardous Material Removal: Returning the Space to Use

Once PCB items, mercury equipment, chemicals or drums have been characterized and removed, the space still has to be put back: surfaces repaired, systems reconnected and finishes replaced. The closeout file from the removal tells the next trade what is clear.

CRE can rebuild the affected area after removal, so the waste file and the rebuild scope stay together. If another contractor takes over, we hand off the manifests and clearance records.

— Who we rebuild for

Hazardous Material Removal for Commercial, Industrial and Institutional Sites

We work on occupied and vacant properties, on emergency and planned schedules.

Weekday → Overnight → Weekend
— Why CRE

Why Property Owners and GCs Choose CRE

Years in the restoration industry
0 +
Emergency response
0 /7
Compliance documentation delivered
0 %
Boroughs plus the Tri-State area
0

One Point of Accountability

We characterize, contain, package and coordinate disposal — and we answer for the paperwork. One contractor, one chain of custody, one closeout file.

Paperwork That Stands Up

The records are the product. Profiles, manifests and certificates are organized so your lender, insurer or agency can follow the material from your site to the facility.

Coordinated With Demolition and Abatement

When hazardous materials turn up mid-project, we can fold them into the same schedule as asbestos, lead and demolition work instead of adding another vendor.

NYS DOL Asbestos Handling License #[LICENSE NUMBER] · Fully bonded & insured · OSHA 40-Hour HAZWOPER-trained crews [CONFIRM]

— The work that comes first

Related Services

Commercial Reconstruction

Restoring the space and its finishes after regulated materials are out.

Interior Demolition

Regulated items removed first, then demolition, under one schedule and contract.

Asbestos Abatement

Often found in the same survey. Licensed abatement with independent monitoring and DEP filings.

Lead Paint Abatement

Lead-painted surfaces and steel, plus lead-contaminated debris characterization.

Environmental Compliance Consulting

Regulatory pathway planning and closeout documentation for complex or public projects.

— Service area

Hazardous Material Removal Across New York City & the Tri-State Area

Hazardous materials turn up everywhere in the five boroughs: pre-1980 fluorescent ballasts in Manhattan offices, shop and chemical residues in Brooklyn and Queens industrial buildings, fuel systems in Bronx and Staten Island properties, and laboratory space across the metro area.

Beyond the city, Long Island, Westchester and Tri-State projects follow state and local rules. Requirements for transport and disposal differ by jurisdiction, so we confirm the route before we mobilize.

— FAQ

Hazardous Material Removal FAQ

What counts as hazardous material in a commercial building?

Common examples are PCB-containing ballasts and caulk, mercury lamps and switches, petroleum products, solvents and laboratory chemicals, batteries and contaminated soil. Asbestos and mold are regulated separately and have their own services. If you are unsure what you have, send photos and labels and we will tell you what to do next.

Usually, yes. Sampling and laboratory analysis, or product documentation, determine how a waste is classified, and classification determines packaging, transport and the facility that can accept it. We coordinate the sampling and use the results to scope and price the job.

Under federal and state rules the property owner or tenant is normally the generator, and the generator keeps responsibility for the waste. That is why the choice of hauler and facility matters. We use permitted haulers and facilities, prepare the manifest for your signature and return signed copies when the facility accepts the load.

Pre-1980 fluorescent ballasts are treated as potentially PCB-containing unless labeled otherwise; caulk and mastic from the 1950s–70s may need sampling. Material at or above 50 ppm is regulated under federal TSCA rules. We sample as needed, remove intact, package and manifest according to the result.

Do not open, move or combine them. If anything is leaking, smells strongly or you feel unwell, leave the area and call 911. Otherwise call us; we will assess, characterize and remove the containers under manifest.

Yes, as separate licensed services with their own requirements and independent monitoring or assessment. When a survey finds several materials, we plan them in one sequence so you avoid duplicate mobilizations.

Yes. CRE performs commercial reconstruction as well as hazardous material removal, so the affected area can be restored on the same schedule. If another contractor takes over, we hand off the manifests and clearance records.

— Get a Quote

Get a Hazardous Material Removal Quote for Your Commercial Property

Tell us what you found, where it is and your timeline. Photos of labels and containers help. We will respond with next steps the same business day — and around the clock for emergencies.

Call 24/7

(000) 000-0000

CRE serves commercial, institutional and government properties. We are not able to take residential projects.